Data Migration
Data migration is where core programs succeed or slip. Our Migration Factory treats it as an engineering discipline: profiled source data, versioned mappings, repeated mock runs and reconciliation down to the last account, so the bank opens on day one with numbers everyone trusts.
What changes for your bank.
- 99.95% or better record-level load success (after agreed exclusions)
- Zero unreconciled GL variance at sign-off
- Downtime kept inside the agreed freeze window
- 100% auditable lineage for every mapped field
Data Migration capabilities
What we migrate
Core-to-core moves and the ecosystem around the core, from legacy platforms to Finastra Essence, T24 or Finacle.
- Legacy core to the latest core banking system
- Trade finance, GL and chart of accounts
- Documents and signatures
- Transaction history and statements
Data profiling and quality remediation
We find duplicates, gaps and broken relationships early, and help business owners fix them while there's still time.
- Source system profiling
- Data quality scorecards
- Remediation workbenches
- Golden customer records
Mapping and transformation
Versioned, reviewable mappings from legacy structures to the target core's products and parameters.
- Field-level mapping specifications
- Product and GL mapping
- Transformation pipelines
- Change control
Mock runs and reconciliation
Each mock run is measured: volumes, timings, rejects and reconciliation breaks, trending to zero.
- Automated reconciliation reports
- Count, sum and sample checks
- Reject handling
- Cutover timing rehearsals
Cutover and sign-off
A rehearsed cutover runbook, with evidence for every sign-off gate.
- Cutover runbooks
- Go/no-go criteria
- Fallback plans
- Post-migration audit packs
How an engagement runs.
- 1
Assess
Source discovery, data profiling, a risk register and agreed success KPIs.
- 2
Map
Data mapping, gap list, transformation rules and a lineage catalog, versioned like code.
- 3
Build
Repeatable ETL pipelines and reusable transforms from our Migration Factory.
- 4
Rehearse
Iterative trial loads with data quality scorecards and performance tuning.
- 5
Cut over
Freeze-window playbook, delta capture, rollback plan and a hypercare war room.
- 6
Sign off
Financial and record-level reconciliation, an audit pack and handover.
Common questions
How long does a migration take?
A typical engagement runs 6–8 weeks to discover and design, 12–16 weeks to build and rehearse, and 1–2 weeks for cutover and hypercare. Volumes and source systems change the plan, and we size it with you during discovery.
How many mock runs do you plan for?
Enough to reach clean reconciliation and a cutover time that fits the window. We plan the count with you during mobilization and adjust it based on results.
Can you migrate from any legacy core?
Our Migration Factory is source-agnostic. We have moved data from a wide range of legacy and in-house banking systems.
Ready to modernize your core banking stack?
Talk to consultants who have built, implemented and run core banking platforms across 14 countries.